PV-MG126BF x 80 panels=10.08 kW system. Tokyo area, direction:
due south, incline: 30°. Estimated yearly power output calculated at 10,192kWh.

Source: Taiki Joka Shokuju Manual (Air Purification Plant Manual), Kogai Kenko Higai Hosho Yobo
Kyokai (Pollution Health Damage Compensation/Prevention Association). Calculation is based on
the assumption of camphor trees being 10 cm in diameter. |
PV-MG126BF x 80 panels=10.08 kW system. Tokyo area, direction: due south,
incline: 30°. Estimated yearly power output calculated at 10,192kWh.

Calculation was made based on NEDO's Taiyoko Hatsuden Donyu Guidebook (Solar Power Generation System
Introduction Guidebook), August 1998. |